contact@easymart.com.au
Request a Quote
The summer holidays are the only reliable window to fit out a school with new lockers. Once Term 1 starts, the corridors are full, the tradespeople are booked, and any delays push the project into the following year. If your school is planning a locker upgrade or a new install for 2027, now is the time to get the order in. This guide walks through everything a school business manager or principal needs to know, from counting student numbers to locking in delivery timing.
Australian schools typically break up for summer in mid-December and return in late January or early February. That gives you roughly six to eight weeks for delivery, installation, and any minor building work. It sounds like plenty of time, but locker orders for schools tend to cluster in the same window, and production slots fill up.
If you order in September or October, you're ahead of the rush. You have time to confirm configurations, get board sign-off, and schedule the install without pressure. Orders placed after November start running into lead time risk, particularly for custom colours or larger quantities.
The current EasyMart promotion on HDPE school lockers closes 30 September 2026. Ordering before then locks in the savings and secures a production slot for a summer install.
The most common mistake in school locker planning is underordering. A locker bank that looks adequate on paper often falls short once you account for staff storage, overflow, and future enrolment growth.
A practical starting point is one locker per enrolled student, plus 10 to 15 percent buffer for growth and staff use. For a school of 600 students, that means planning for 660 to 690 lockers rather than exactly 600.
Consider also where the lockers will be located. A single centralised bank works for smaller schools. Larger schools typically distribute lockers by year group or faculty area, which affects the number of separate locker runs and the configurations needed for each space.
Locker sizing depends on what students need to store and how much wall space is available. The most common configurations for Australian schools are:
Standard locker widths run from 300mm to 450mm. Depth is typically 300mm to 450mm. For secondary students with large bags, 380mm depth is a practical minimum.
Not all school locker areas are the same. Covered outdoor corridors, undercover walkways, and semi-exposed areas need a different specification to fully indoor installations.
| Location | Recommended Spec | Key Reason |
|---|---|---|
| Fully indoor (climate-controlled) | Standard HDPE or steel | Either works in a dry, sheltered environment |
| Indoor but humid (near canteen, change rooms) | Standard HDPE | Waterproof, won't rust in humid conditions |
| Covered outdoor corridor or undercover walkway | Weather Resistant HDPE | UV-stabilised, 8-year warranty for undercover outdoor use |
| Coastal school (salt air exposure) | Weather Resistant HDPE | Unaffected by salt air, no corrosion risk |
If your school has a mix of indoor and outdoor locker areas, it's worth specifying each run separately rather than applying a single spec across the whole order. Our team can help you work through the breakdown.
School lockers take more punishment than almost any other commercial application. Doors get kicked, locks get forced, and graffiti is a constant issue in some environments. Choosing the right material from the start avoids costly repairs and early replacement.
HDPE lockers handle this environment well. The colour runs through the full thickness of the panel, so scratches don't expose a different layer. Graffiti and marker pen can usually be removed with a solvent cleaner without damaging the surface. There's no powder coat to chip and no bare metal to rust.
For locking, the most common options for schools are:
EasyMart's HDPE lockers carry an 8-year warranty for outdoor undercover installations. For fully indoor use, confirm the warranty terms with our team at the time of order.
Browse the full HDPE plastic lockers collection to compare options and configurations.
School locker projects typically require board or P&C approval, which means the budget needs to be documented and justified before the order can be placed. A few things that help the approval process move quickly:
Getting the timing right is the difference between a smooth summer install and a last-minute scramble. Here's a practical timeline working back from a late January 2027 school return:
If your school is in a state with an earlier return date (some Queensland and Western Australian schools return in late January), adjust the timeline accordingly and order earlier.
EasyMart supplies school locker orders of all sizes, but bulk orders attract better pricing and are prioritised for production scheduling. The current promotion applies to qualifying HDPE locker orders and includes:
A minimum 30 order applies. The offer closes 30 September 2026.
To get started, use our bulk order page to submit your requirements: number of lockers, configuration, location type (indoor or outdoor), preferred colour, and locking type. Our team will come back with a formal quote and lead time confirmation.
Order before 30 September to lock in the savings and a production slot for a summer install.
How many lockers does a school need?|||A practical starting point is one locker per enrolled student, plus a 10 to 15 percent buffer for growth and staff use. For a school of 600 students, plan for 660 to 690 lockers. Distributing lockers by year group or faculty area may also affect the total number of runs required.@@@What is the best locker material for Australian schools?|||HDPE plastic lockers are the most practical choice for Australian schools. They resist graffiti, handle heavy daily use, won't rust in humid or coastal environments, and carry longer warranties than steel. The colour runs through the full panel thickness, so scratches are less visible.@@@How long does a school locker installation take?|||Installation time depends on the size of the order and the complexity of the space. A standard run of 100 to 200 lockers can typically be installed in one to two days by a local tradesperson. Larger orders or multi-building installs may take longer. Allow at least one week of buffer in your summer timeline.@@@What warranty do HDPE school lockers carry?|||EasyMart's HDPE lockers carry an 8-year warranty for outdoor undercover installations. For fully indoor use, confirm the warranty terms with our team at the time of order. Steel locker warranties are typically shorter and may exclude rust damage caused by environmental conditions.@@@Can I get a bulk quote for school lockers?|||Yes. Use the EasyMart bulk order page to submit your requirements including number of lockers, configuration, location type, colour, and locking preference. Our team will respond with a formal quote and lead time. The current promotion closes 30 September 2026, so it's worth getting your quote in early.@@@